Home
Systems
— Overview — Waterproofing & Structural Repair — Concrete Repair — Epoxy, Resin & Industrial Flooring — Decorative Cement Systems — Vinyl & Hybrid Flooring — Construction Chemicals
Products
— All products — a.b.e. Construction Chemicals — Cemcrete — Technical Finishes — Finfloor
Resources
— Learning Centre — Technical Downloads — Blog — FAQ
About
— About Tswanacrete — Services Contact WhatsApp Us →
Technical Finishes

Technical Finishes Solidkote Impact

Heavy-duty epoxy floor coating system

Solidkote Impact is a Technical Finishes epoxy floor system for industrial and commercial floors subject to traffic, impact and chemical spillage. It is mixed with a mechanical power mixer and laid to a set coverage before being smoothed off.

  • Supplied from our Gaborone warehouse
  • Manufacturer data sheet on this page
  • Technical support from Gaborone

Tell us your programme date and we will work back from it. Confirm availability on WhatsApp.

Grey epoxy floor coating in a retail warehouse, Gaborone, Botswana

Product at a glance

SystemEpoxy floor coating system
MixingMechanical power mixer required
DegreasingSuitable degreaser such as Liquid Action before application
StorageUnopened packaging, cool and dry, away from direct sunlight
BrandTechnical Finishes
AvailabilityCommon colours held in Gaborone
Commonly specified colours held in Gaborone. Full colour range ordered on confirmation, typically 10 – 12 working days.

Working days exclude weekends and Botswana public holidays, and run from order confirmation rather than from enquiry. Cross-border clearance can occasionally extend a delivery — we will tell you if it does. Tell us your programme date and we will work back from it. Lead times for Technical Finishes are shown on the Technical Finishes page.

Where Solidkote Impact is used

Coverage & packaging

CoverageNot stated on the datasheet held on file — confirm with us before ordering
PrimerSolidkote Impact Primer, per the manufacturer's specification

Note on quantities. Resin floor quantities depend on the system build-up specified, the floor's profile after mechanical preparation, and the finish required. Confirm the coverage rate and system build-up with us against the current Technical Finishes datasheet before ordering.

Before you specify it

Technical documents

Manufacturer documents, reproduced as issued. Revisions change — confirm you have the current issue with us before writing it into a specification.

The complete system

Solidkote Impact is one part of a system. The steps below are the sequence this product normally sits in.

  1. PreparationDegrease, then diamond grind or shot blast
  2. RepairReinstate damaged slab areas before coating
  3. PrimingSolidkote Impact Primer
  4. CoatingSolidkote Impact to the specified build-up

You may also need

Further reading

Need help specifying Solidkote Impact?

Tell us the substrate, the area and the exposure and we will confirm whether this is the right system, what preparation it needs, and what it will cost.