Fibre-reinforced repair mortar with corrosion inhibitor
durarep® FR is a polymer-modified, fibre-reinforced cement-based repair mortar incorporating a migrating corrosion inhibitor (MCI). It is non-shrink, chloride-free, and gives four to six times the abrasion resistance of plain rendering.
Tell us your programme date and we will work back from it. Confirm availability on WhatsApp.

| System | Polymer-modified, fibre-reinforced cement-based mortar |
|---|---|
| Corrosion protection | Incorporates a migrating corrosion inhibitor (MCI) |
| Composition | Chloride-free, non-shrink, non-toxic |
| Abrasion resistance | 4 – 6 times that of plain rendering |
| Durability | Resistant to frost and thawing salts |
| Brand | a.b.e. Construction Chemicals |
| Availability | Held in Gaborone Held in Gaborone — collection or local delivery. |
Working days exclude weekends and Botswana public holidays, and run from order confirmation rather than from enquiry. Cross-border clearance can occasionally extend a delivery — we will tell you if it does. Tell us your programme date and we will work back from it. Lead times for a.b.e. Construction Chemicals are shown on the a.b.e. Construction Chemicals page.
| Yield | 25 kg powder with 4.2 litres of water yields approximately 13 litres |
|---|---|
| Pack size | 25 kg polyethylene-lined paper bags |
| Minimum edge depth | Square cut to at least 10 mm, perpendicular to the surface |
| Shelf life | 12 months in original packaging, dry and cool |
Note on quantities. Repair mortar quantities come from the volume of the breakout, not surface area. Work from the repair depth and allow for over-break. Confirm against the current a.b.e. data sheet before ordering.
Manufacturer documents, reproduced as issued. Revisions change — confirm you have the current issue with us before writing it into a specification.
durarep FR is one part of a system. The steps below are the sequence this product normally sits in.
Tell us the substrate, the area and the exposure and we will confirm whether this is the right system, what preparation it needs, and what it will cost.