Home
Systems
— Overview — Waterproofing & Structural Repair — Concrete Repair — Epoxy, Resin & Industrial Flooring — Decorative Cement Systems — Vinyl & Hybrid Flooring — Construction Chemicals
Products
— All products — a.b.e. Construction Chemicals — Cemcrete — Technical Finishes — Finfloor
Resources
— Learning Centre — Technical Downloads — Blog — FAQ
About
— About Tswanacrete — Services Contact WhatsApp Us →
a.b.e. Construction Chemicals

a.b.e. duragrout®

Non-shrink cementitious grout for baseplates and anchors

duragrout® is a pre-bagged, non-shrink cementitious grout for bedding baseplates, machine bases, anchor bolts and structural gaps where a flowable, dimensionally stable grout is required.

  • Supplied from our Gaborone warehouse
  • Manufacturer data sheet on this page
  • Technical support from Gaborone

Tell us your programme date and we will work back from it. Confirm availability on WhatsApp.

Structural concrete works in Botswana

Product at a glance

SystemPre-bagged non-shrink cementitious grout
Yield per bagApproximately 0.0125 m³ (12.5 litres)
Water demandApproximately 4.5 litres per bag
Extended yieldAbove 0.023 m³ (23 litres) when extended per specification
Expansion at 3 days0.30%
Branda.b.e. Construction Chemicals
AvailabilityHeld in Gaborone
Held in Gaborone — collection or local delivery.

Working days exclude weekends and Botswana public holidays, and run from order confirmation rather than from enquiry. Cross-border clearance can occasionally extend a delivery — we will tell you if it does. Tell us your programme date and we will work back from it. Lead times for a.b.e. Construction Chemicals are shown on the a.b.e. Construction Chemicals page.

Where duragrout is used

Coverage & packaging

YieldApproximately 12.5 litres of grout per 25 kg bag
Water demandApproximately 4.5 litres per bag
Pack size25 kg polyethylene-lined paper bags
Shelf life12 months in a dry store, sealed

Note on quantities. Grout quantities are calculated from the void volume to be filled, not from surface area. Confirm yield and extension rates against the current a.b.e. technical data sheet.

Before you specify it

Technical documents

Manufacturer documents, reproduced as issued. Revisions change — confirm you have the current issue with us before writing it into a specification.

The complete system

duragrout is one part of a system. The steps below are the sequence this product normally sits in.

  1. PreparationClean and pre-dampen the substrate, set formwork
  2. Groutingduragrout® placed from one side
  3. Repair / making gooddurarep® range where concrete is damaged

You may also need

Further reading

Need help specifying duragrout?

Tell us the substrate, the area and the exposure and we will confirm whether this is the right system, what preparation it needs, and what it will cost.