Twin-pack cement coating for pool refurbishment
Pool Coating is a twin-pack cement-based coating applied by roof paint brush over a sound existing surface. Based on white Portland cement, it sets rock hard, performs well underwater and can be repeatedly scrubbed. It is non-hazardous, and potable water can be stored in structures treated internally with it.
Tell us your programme date and we will work back from it. Confirm availability on WhatsApp.



| Type | Twin-pack cement coating |
|---|---|
| Base | White Portland cement |
| Pot life | 45 minutes |
| Working time | 45 minutes — thickens in hot conditions |
| Initial set | 1 hour |
| Touch dry | 3 – 4 hours depending on weather |
| Minimum thickness | Approximately 1.1 – 1.2 mm overall in 2 coats |
| Application temperature | 6 °C to 25 °C ambient and substrate |
| Potable water | Suitable for structures storing potable water, treated internally |
| Brand | Cemcrete |
| Availability | Ordered per project Ordered per project on confirmation, typically 5 – 7 working days. |
Working days exclude weekends and Botswana public holidays, and run from order confirmation rather than from enquiry. Cross-border clearance can occasionally extend a delivery — we will tell you if it does. Tell us your programme date and we will work back from it. Lead times for Cemcrete are shown on the Cemcrete page.
| Coverage | One 15 kg twin-pack covers approximately 25 m² over two coats |
|---|---|
| Typical pool | Three packs are usually sufficient for an average 4.5 m × 9 m pool |
| Pack size | 15 kg twin-pack |
| Priming | See the Concrete Primer datasheet for coverage |
Note on quantities. The 25 m² per pack figure depends on surface profile and on ambient and surface temperature. A rough or porous substrate consumes more. Confirm against the current Cemcrete datasheet before ordering.
Manufacturer documents, reproduced as issued. Revisions change — confirm you have the current issue with us before writing it into a specification.
Pool Coating is one part of a system. The steps below are the sequence this product normally sits in.
Tell us the substrate, the area and the exposure and we will confirm whether this is the right system, what preparation it needs, and what it will cost.